Slide the green button at the bottom of the screen — that's it.
Once you've started a job and finished the clean, the bottom action bar shows a Slide to Complete Job bar.
How to complete:
Make sure all interactive checklist items are ticked (tick them as you go)
Take your before/after photos if the job calls for them — customers love them and they protect your Quality Control score
Slide the green button all the way to the right
You'll see a confirmation toast with the job duration in minutes
What happens next:
The job moves from In Progress → Completed
Your earnings for this job are locked in and added to the current week's pay run
The customer is asked to leave a rating (which feeds your Satisfaction score — 35% of your composite)
You're free to head to your next job
Why the slide (and not a button)?
Prevents accidental taps — you can't slide by mistake if your phone is in your pocket
Gives you one final chance to double-check you're really done before the timer stops
Before you slide, double-check:
Every checklist item is ticked
Photos are uploaded (if required)
You've done a final walk-through with the customer if they're home
Rubbish and your equipment are out of the property
The slide is the last step — once it's done, the job is locked in and payment is on its way.